Project Portfolio - Infrastructure Marine Services


Chicago, Illinois

Responsible for the recovery of over 15,000 gallons of accidentally spilled coal tar from the bottom of an inland waterway in the Chicago area. The coal tar was recovered using a diver operated dredge while the possible migration of contaminants to the surface was minimized by the use of an EMS designed surface exhaust system. Employees worked in Level A, Level B and Level C

Unique Features

  • Diver operated Dredge
  • Surface exhaust
  • Over 15,000 gallons of product recovered
  • Element Content
Top