Harbor Sampling and Temporary Cover
Lake Michigan
Provided sediment sampling at a Superfund Site on Lake Michigan. After the sampling was completed, the U.S. EPA was interested in placing a temporary HDPE cap over a PCB “hot spot” to prevent this from washing out during spring runoff. Provided the design and installation of the HDPE cap and performed as a sub-consultant for the U.S. Environmental Protection Agency’s ERCS contractor.
Unique Features
- Provided sampling services with both divers and drill rig from barge system
- Designed HDPE cap for PCB “hot spot”
- Installed temporary HDPE cap
- Project completed on time and within budget
- Project completed on time and within budget
- No accidents or injuries